They got it all done

A lot of action items got taken care of today.

The Awlgrip cured enough to buff out the last imperfections, put the name back on and install the Aries windvane.
The fiberglass job outside and inside the boat were completed. Barrier coat and bottom paint were applied.
The shrink wrap cover was removed
All remaining items were taken out of storage, lifted on the boat and installed.
After long discussions, we were finally able to convince the local hydraulics store to put 500 PSI on the serviced vang. And yes, the boom is now able to carry the main without a topping lift again.
The hydraulic tank was refilled and cockpit lazarettes loaded.
Kitchen and bathroom were cleaned, water tanks filled.
Late at night, when the wind had calmed down, we even put the genoa on.
On top of all this, Cathy managed to drive to the airport and pick up Linda and Lilly. We are now complete and celebrated that with another dinner and drinks at our local hang out at the water.

So far so good.
Unfortunately, Powerboats determined that the outside epoxy was not hardened enough to allow the crane to pick us up. We therefore moved that appointment to tomorrow morning.
While we still have quite a few action items left, they are all manageable and should Tioga float and the engine start we will be able to leave in the afternoon tomorrow.

We can’t wait to finally get going again.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s